Friday, May 4, 2012

The End of Polyhouse at sunny Acres :(

This is a sad day for me personally. To know that a project I have been devoted to for 7 years has ended. Hopefully only for this project and not for good. Although I think the gross negligence and reckless regard for the students safety might have done irreputable damage to the program.

 I have been accused of many things over the last few days. I have suffered much because of the cover up and the ensuing lies and character assignation.
I try and tell myslf, It is all good as I do not read the papers or own a TV. I also know it is none of my business what anyone thinks about me. I know I can only change the face I see in the mirror. It still hurts when friends tell me what they have heard and what they think they know.

I know when people are guilty they start to blame others and tell lies to cover up their misdeeds. The truth will ultimately prevail. People will lose their credibility as a few already have. I will stay steadfast to telling the truth no mater what lies others will try and say.

I just finished a long email to Jeff Armstrong the President of Cal Poly. I let him know the truth about how the Polyhouse professor and Dan have put the students at risk. They both knowingly allow students to drive over, work around and walk over the PVC gas lines in the pictures below.

The 1st day was when only Dan and some of his people knew the students were driving dump trucks full of fire wood, tractors, and a skip loader with old oak wine barrels over this illegal PVC gas line.

The line was discovered on April 21st the 1st Sat when the public and the students started the clean up process. The professor was told that day. I told her as soon as I heard about it. She did nothing.
I had even told a higher person in more authority in the engineering dept that I was going to talk with the president about my safety concerns and about the pending failure of this project because of Dan's behavior. He asked me not to do that. He would talk with the professor about my concerns.
Nothing changed, except I was systematically cut out of the loop of the plans and progress.

I realized that early on and it did not stop me from showing up ready willing and able to help. The incidents surrounding the septic tank pumping where explained on the cal coast news comment section.

This is my 1st attempt at downloading a video. This is of the septic tank to be filled and of the wires found in the ground, the crazy yurts, the new illegal  electric circuits added to a previous legal one breaker panel. The tour of the Stucco barn many have yet to see any of the extent or gross negligence Dan has done that endangered so many he claims to care about. Opps guess I will have to try You Tube.


 The 1st is when I dug it up. I only dug down about 5 inches and hit the lid. How nice of Dan to put it in a box and save me all the digging I thought I was going to have to do. The 2nd is one of the trucks. Dan had come in that drove over the line while I was on site. The 3rd is how it appeared to the right of the Dairy barn.                                                                                                                                   

I got an email last night and a warning sent from someone that has ties to Sunny Acres that I needed to be careful and stay away as something strange is going on. I am headed out of town ASAP.                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                                     

No comments:

Post a Comment